This week, we're working on doing our Most Critical Module Engineering. For our MCM, we're doing the arm that we will use to push the ping-pong balls over the dividing wall. There are 4 parts which need any intensive manufacturing. One problem we have discovered with our plan is that the PVC pipes do not telescope the way we thought they would. This means we'll have to use the lathe to remove some of the outer diameter on the smaller part. Once we have finished our engineering drawings of the module, we'll make a step-by-step manufacturing process, and hopefully be able to start making it next week!